Bay Electric Project
Hanger 49
Relocate Operations
Center
Elizabeth City, NC
$470,000
Bay was the prime contractor for
relocating the Operations Center for the Elizabeth City airport.
Bay remodeled seven rooms and
completing work that included:
-
Remediate lead paint and asbestos floor tiles
-
Painting
-
Fire projection system
-
HVAC system
-
Plumbing including water closet and lavatories
-
Carpet, vinyl tile and vinyl cove base
-
Raise floor panel system
-
Gypsum walls with metal studs
-
Doors, windows and framing
-
Ceramic tile
-
Suspended ceiling
-
New partial SIPERNET system
|