Bay Electric Project

Building 25, Hampton, Va.

Langley Air Force Base

Home of ACC Communications Group

U.S. Air Force

$2.45 Million

Bay was the prime contractor for repairing the power distribution system in Building 25 at Langley Air Force Base.

This project included:

  • UPS room with CMU and gypsum walls and door

  • Demo acoustic ceilings, doors and frames

  • 3 dry type transformers

  • 3 main switchboards

  • 9 TVSS units

  • 29 panel boards

  • 750 kW generator

  • 3,000 A outdoor switchgear

  • 300kVA UPS unit with battery backup system

  • Install 7-0 feet of duct bank

  • Install over 40,000 feet of feeders