Bay Electric Project
Building 25, Hampton,
Va.
Langley Air Force
Base
Home of ACC
Communications Group
U.S. Air Force
$2.45 Million
Bay was the prime contractor for
repairing the power distribution system in Building 25 at Langley Air Force
Base.
This project included:
-
UPS room with CMU
and gypsum walls and door
-
Demo acoustic
ceilings, doors and frames
-
3 dry type
transformers
-
3 main switchboards
-
9 TVSS units
-
29 panel boards
-
750 kW generator
-
3,000 A outdoor
switchgear
-
300kVA UPS unit
with battery backup system
-
Install 7-0 feet of
duct bank
-
Install over 40,000
feet of feeders