Bay Electric Project

Building M-51

Naval Station Norfolk (NSN)

Norfolk, Va.

Prime Electrical Contractor

$205K

Bay Electric Co., Inc. was the prime electrical contractor on this project, replacing 6,870 ft. of 34.5kV (750-kemil) cable in an existing duct bank from Switch 215 to Switch 230.

The cable was spliced every 1,200 ft. and fireproofed at every manhole.

Switch 230

Switch 215

 

 