Ready to Get Started? Request Services

NNSY Turnstile Fiber Installation

2209 NNSY Turnstile Fiber Installation

Project Title: NNSY Turnstile Fiber Installation

Project Description:

The work includes providing Fiber Optic cable, Corning 4U Rack in Patch Panel, Fiber Optic jumpers, required hardware and incidental related work. This project involves utilizing temporary 8' security fencing prior to performing work on the following Turnstile on Gates Numbers 3,10C, 10, 13, 15 and 43 and associated Facility Buildings 19, 60, 65, 236, 1500, 1502 and 369.

The work is to be performed in several phases to assure access to Norfolk Naval Shipyard is hampered to minimum as possible.

Categories: 
Related Posts
  • P516 Ship Repair Pier 5 Replacement Read More
  • NASA Measurement Systems Laboratory (MSL) Read More
  • Portsmouth Pavilion Read More
/